Occupational safety, construction methods, comprehensive solutions to protect human life.
Work safety and fire safety in each building is the first to limit the risk of human life. Wherever we go, no matter where we find the phrase “Safety is above all,” true to the reality, man helps to build the country, to better the life, so everyone must protect and say Protect the people around when doing a construction work.
For us to install soundproofing, electrical installation and installation of the generator also put the safety issues and fire safety to the top.

Soundproofing: Where welding material is used with electrodes, it is often used to generate heat and fire, so it is a good idea to use fire extinguishers in the form of powder and gas, ready for fire. explosion occurs, seat belt safety for the user or climb higher than 2 meters.

Electric power cable system: Where there are often flammable materials, the preparation includes silver fire protection, comprehensive protection of the equipment, comprehensive cleaning before leaving the works at the end of a a hard working day

Area and comprehensive use of space, sanitation, safety, non-smoking or smoking places where signs are, so people can observe, and act easily when a problem occurs.

It is not easy to take action, but to act in a way that improves the quality of life and protects the safety of those around you. For foreign companies, insurance, safety and security Extinguishers are almost always put out, and errors and errors are often handled by the director, or the authorized person, for a complete plan for safety and firefighting.

The Japanese people are often seen in Japanese companies as “If you see other people’s faults that do not fix, then it is your fault”, so from human consciousness leading to better actions. for life or it is a disaster for the whole community, it’s up to you, the company, and the people around you.
For our company is the leading unit in the field of basic construction, but still ensure 100% safety conditions and fire protection is highest in construction systems and generators. Our work is on the whole territory of Vietnam and the standard is checked under the inspection of the state-owned companies. You really have peace of mind that, the product and the safety we place on the oil, we have new steps to date.
STC Technology Vietnam Co., Ltd.
To thank the customer heart. We constantly improve our experience and knowledge to give our customers peace of mind and trust when assigning tasks to us.
F1, Packsimex Tower, 52 Dong Du Str, Bengnhe .W, 1 Dis, Hochiminh City
0911.77.08.78 - 0907.526.268
sales.247dichvu@gmail.com
sales.247dichvu@gmail.com
STC VIET NAM © 2017 stc-vn.com. All rights reserved.
Design by: https://stc-vn.com/
Leave a Reply